Instant moving quote with real planning inputs

A faster quote is still only useful when the local constraints are visible before dispatch.

Mover recording inventory on a tablet while a colleague measures furniture during an in-home moving estimate

Official rules to confirm before requesting a quote

Latest source review: September 28, 2026. Individual access dates appear below.

  • Consumer protection

    When a Québec consumer hires a mover by phone or online, the law requires a written contract, which the mover must send within 15 days; before concluding, the mover must disclose the total cost, payment terms and the move's date and time.[1]

  • Consumer protection

    If a mover hired by phone or online doesn't send the written contract within 15 days, the consumer can cancel within 30 days of concluding it; the mover must refund within 15 days after the cancellation notice is sent.[2]

  • Consumer protection

    Contrary to popular belief, Québec consumers have no automatic 10-day period to back out of a moving contract, so the OPC advises not signing anything until you have truly decided on a mover.[1][2]

  • Consumer protection

    A Québec mover cannot demand more than the price in the contract; faced with unplanned fees, the OPC says you may refuse to pay them, or pay 'sous protêt' (under protest) and then claim the excess with a formal demand letter.[3]

  • Permit

    Vancouver’s temporary street-occupancy permit covers moving trucks and containers. Allow 7–10 business days after payment for processing and signs. Requests with only 5–7 business days require staff assessment and are not guaranteed.[4]

  • Permit

    When an Ottawa encroachment permit is needed, the City states a minimum of 10 business days for issuance. Temporarily removing parking needs at least four business days’ notice; a Traffic Management Inspector reviews a proposed container or material placement after application. These are different steps, not approval guarantees.[5]

What changes a quote in our pricing model

Illustrative pricing-model estimate in CAD, before tax. Your addresses, date, inventory and services determine your quote.

Illustrative example — What changes a 2-bedroom quote in Toronto (Scarborough → Midtown Yonge-Eglinton)
Quote inputEstimateChange vs baseHours on the clock
Base estimate$850none2.6 h
2 flights of stairs at pickup$1,525+$6755.0 h
Elevator at both addresses$975+$1253.0 h
Booked within 48 hours$875+$252.7 h
Prestige tier$1,275+$4253.0 h
Standard tier$625−$2252.2 h

How these figures were produced

  • Hypothetical Scarborough → Midtown Yonge-Eglinton example: an input distance of 19.2 km and duration of 21 min. Actual addresses can produce a different route.
  • 2 bedrooms: two bedroom sets, a sofa and armchair, a dining set for four, a desk and 40 boxes (754 cu ft, 3,326 lb).
  • Base estimate: Plus tier, ground floor at both addresses.
  • This comparison isolates the short-notice time allowance. It does not calculate every adjustment for an actual booking date.
  • The crew is what the model assigns: it grows with volume, weight and the number of items of 150 lb or more.
  • Neutral scenario with no booking date, postal-zone or capacity adjustment. Your selected date, addresses and services can change the quote.
  • Pricing version moving-freight-tax-ca-20260810-v2, captured 2026-09-27. Moving base amounts are in CAD before tax, with upward rounding in $25 increments.
  • Packing labour, storage, disassembly and other add-ons are not included.

Provenance of data used for the assumptions: © OpenStreetMap contributors (ODbL).

Local details that change the estimate

A faster quote is still only useful when the local constraints are visible before dispatch.

Share building type, floor count, stairs, elevator rules, parking or loading access, and any fragile rooms before the quote is finalized.

Flag packing, storage, disposal, or delivery-window constraints early so the estimate does not hide a move-day surprise.

Quote FAQ

Does an instant calculation shorten Vancouver’s permit lead time?

No. Normal temporary street occupancy takes seven to ten business days after payment; a five-to-seven-day request requires direct assessment without an approval guarantee. Capture the real street-permission status in the quote request so a quick calculation is not mistaken for permission to unload.

Is every online Québec booking covered by a ten-day cancellation period?

No. The OPC distinguishes ordinary moving-service cancellation from remedies for a deficient distance contract. Review the specific written-contract and disclosure rules and the applicable cancellation remedy, rather than assuming a general cooling-off period follows from the speed of the calculation.